Contact Us

Have questions? Please contact us.

Scheduling and Rough Capacity Check

Identify Bottlenecks Early and Plan Delivery Dates with Pinpoint Accuracy

Benefit from the addition and expansion of delivery date determination already during the entry of sales orders. With our solution, capacities are managed and checked in addition to standard scheduling. In this way, the delivery date can be determined more precisely and more closely matched to the product. In addition, overbooking of the individual production periods can already be detected during order entry.

Your Benefits
Functions
Scope
Requirements

Characteristic Combinations at a Glance

Scheduling the replenishment lead time per combination

Monitor Available Capacities

Capacity table per time segment, product characteristics and plant

Optimize Route Planning

Consideration of fixed delivery days during sales order creation

Your Benefits

Avoid Capacity Bottlenecks During the Sales Order Creation Process while Determine Delivery Dates with Pinpoint Accuracy

Our solution checks all sales document items relevant for delivery date determination during the sales order entry. With the help of the planning table, capacity data is displayed for each period in order to identify capacity bottlenecks at an early stage. The scheduling check can be carried out against a route or plant calendar, delivery times for the material or individual characteristic values or the replenishment lead time of the material and characteristic value-dependent surcharges/discounts. In this way, overbooking of free capacities can be avoided and a delivery date specific to the product can be determined.

Functions & Features of Scheduling and Rough Capacity Check

Delivery date determination is supplemented by the management of capacities in sales document entry. The following points can be taken into account in delivery date determination:
 

  • Checking of delivery days against a delivery day calendar
  • Consideration of replenishment lead times depending on customer-specific product properties (characteristic values).
  • Capacity table: Checking of free available capacities per time period and depending e.g. on product characteristics and plant
  • Storage of release dates for individual characteristic values

Scope

The scope of delivery includes:

  • Provision of the software license
  • Provision of relevant transport requests
  • Installation guide with description of the technical requirements as well as the necessary import steps
  • Customizing documentation with description of the necessary and optional settings for the solution
  • User documentation with description of how the solution works
     

Available languages:

  • Solution (user interface, online help and messages): English, German
  • Documentation: German

Requirements

SAP Release

  • SAP S/4HANA Finance 1503 and 1605 or
  • SAP S/4HANA 1511 – 2020 (on-premise edition)
     

Special Software Components

  • SAP_FIN 7.20 – 7.30 or
  • S4CORE 1.00 – 1.05
  • SAP_ABA / SAP_BASIS 7.50 – 7.55

Get In Touch

Are you looking for further information on Scheduling and Rough Capacity Check? Just contact us – we are happy to assist you.